Cell-Crete Home
About Us Projects Services Contact Us Cell-Crete Home
in this section...

Floor

Roof
  • Product Line
  • Roof Projects
  • Low Slope Roof Design
  • Design Consideration
  • Mr. Structural Engineer
  • Comparison
  • Effective Crickets

    Engineered Fill

    Architectural Concrete

    Did You Know...

    Louis Fisher, Sr. helped to design the first portable concrete pumps in 1956.

    Concrete Roofing Projects by Cell-Crete


    Agua Caliente Spa Resort Casino

    Client: PENTA Building Group / Commercial Roofers

    Location: Agua Caliente Spa Resort Casino, Palm Springs, California

    Date: Spring/Summer 2003

    Square Footage: 131,000

    Situated on nine acres in the heart of beautiful and historical downtown Pal Springs, California, Agua Caliente is the only full-service resort offering casino, spa and hotel amenities. The renovation of the casino and resort called for the installation of Elastizell insulating concrete over 4” EPS board creating an R-19 insulation value over 1-1/2” metal deck.


    Wynn Resort
    Client: Marnell Corrao Associates, Inc.

    Location: Wynn Resort (formerly La Reve), Las Vegas, Nevada

    Date: Summer 2004

    Square Footage: 900,000

    Packed with a nightclub; lake; 110,000 square foot casino; 18 restaurants; golf course; and an on-site, full-service Ferrari and Maserati dealership, Wynn Resort is going to be the crème de la crème of the Las Vegas strip! As part of this monstrous construction fete, Cell-Crete installed Elastizell Insulating Concrete over EPS board creating an R-19 insulation value over sloped metal deck over approximately 900,000 square feet and pumped the 56 story tower. What makes this job especially unique is that it holds the West Coast height record for jobs using Elastizell! Due to the size and volume that this job encompassed, at times, Cell-Crete provided 3 separate crews and equipment to keep up with the fast paced schedule that the project demanded.


    The Fashion Show
    Client: Commercial Roofers

    Location: Fashion Show Mall East, Las Vegas, Nevada

    Date: June 2003

    Square Footage: Approximately 29,000

    One of the nation’s largest shopping centers and Las Vegas’ premier retail destination, Fashion Show Mall offers 7 classy department stores including Saks 5 th Avenue, Dillards, and Neiman Marcus on top of 250 extraordinary shops and restaurants. This classy mall received installation of Elastizell Insulating Concrete over 4” EPS at the low and high roofs’ 1-1/2” metal deck.


    AlaskaClient: Dick Pacific Ghemm JV

    Location: US Army, Ft. Wainwright, Alaska

    Date: Spring 2003

    Square Footage: 188,000

    In Fort Wainwright, Alaska, home of the United States Army Garrison and units of the United States Army Alaska (USARAK), Zonolite Insulating Concrete System with specified fibers was poured over an interstitial metal deck floor for fire rating. Our crew mobilized themselves and equipment from Southern California all the way to Alaska, worked in below freezing conditions, and finished the job to the specifications of the customer.


    Client: Perini Building Company

    Location: Palms Casino and Resort, Las Vegas, Nevada

    Date: Winter 2001

    Square Footage: 66,300

    This Vegas-meets-Palm Beach resort and casino has attracted high reviews with its comfortable rooms, hip Ghost bar, and friendly service all around. This party-central casino and resort received Zonolite Insulating Concrete over EPS Board and crickets to its’ roof top.


    Kodak Theater
    Client: McCarthy Building Company

    Location: Kodak Theater (“Home of the Emmys”) Hollywood & Highland, Hollywood, California

    Date: 2001

    Square Footage: 127,000

    If entertainment is what you are looking for in Hollywood, California, this is the place! Hollywood and Highland’s visitors boast that their bowling alley, nightclub, grand ballroom catered by Wolfgang Puck and new state of the art Mann Chinese 6 theaters provide hours of entertainment in the heart of Hollywood. This was a mixed-use project combining the new retail areas and several ballrooms, one which houses the Academy Awards. It is also tied to the subway and is a very large profile building in the L.A. area. The project is sloped in the structure with Elastizell. In addition, Cell-Crete poured the hotel next door for Matt Construction. In order to execute this project, a crane was used to lift the rig up and onto the roof.


    Client: Marnell Corrao Associates, Inc.

    Location: Bellagio Spa Low Rise

    Date: Winter/Spring 2004

    Square Footage: 146,000

    This 925 luxurious room and suite tower addition, will soon feature an expansion of the resort’s elegant spa and salon, additional meeting and convention space, added retail and a casually elegant restaurant, Sensi. Cell-Crete aided in this expansion by installing Elastizell insulating concrete 200 PSI over EPS board to create an R-19 insulation value over sloped metal deck with fiber mesh for a two-hour fire rating.


     

     

    Copyright © 1965-2005, Cell-Crete Corp. All rights reserved.