[bt_section][bt_row][bt_column width=”2/3″ align=”left” vertical_align=”inherit” border=”no_border” cell_padding=”default” animation=”no_animation” text_indent=”no_text_indent” background_color=”” transparent=”” el_class=”” el_style=””][bt_header superheadline=”” headline=”About The Project” headline_size=”medium” dash=”no” subheadline=”” el_class=”” el_style=””][/bt_header][bt_header superheadline=”” headline=”PROJECT LOCATION” headline_size=”small” dash=”no” subheadline=”Alameda, California” el_class=”” el_style=””][/bt_header][bt_header superheadline=”” headline=”COMPLETION DATE” headline_size=”small” dash=”no” subheadline=”2021″ el_class=”” el_style=””][/bt_header][bt_text]
Bay 37 – Alameda Point
New buildings are being constructed along with a variety of amenities for residents including picnic areas, a playground, a public dock, walking paths and more in Alameda, CA. Evaluation results of the proposed buildings concluded that the estimated total and differential settlements were excessive for the planned structures and settlement mitigation techniques be sought out.
[/bt_text][bt_header superheadline=”” headline=”The Solution” headline_size=”medium” dash=”no” subheadline=”” el_class=”” el_style=””][/bt_header][bt_text]
Lightweight cellular concrete was a proposed solution to reduce the long-term consolidation settlement of the site. The lightweight fill was placed underneath multiple building pads and streets to provide load balance for the soil. Before pouring the soil was excavated, then 8’ of LCC was poured in 3 lifts. Utilities were installed prior to the pour and in between the placement of each cellular concrete lift.
[/bt_text][bt_header][/bt_header][/bt_column][bt_column width=”1/3″ align=”left” vertical_align=”inherit” border=”no_border” cell_padding=”btDoublePadding” animation=”no_animation” text_indent=”no_text_indent” background_color=”” transparent=”” el_class=”” el_style=”padding-right: 0;”][bt_header superheadline=”” headline=”Project Assets” headline_size=”medium” dash=”no” subheadline=”” el_class=”” el_style=””][/bt_header][bt_hr top_spaced=”topSmallSpaced” bottom_spaced=”not-spaced” transparent_border=”noBorder” el_class=”” el_style=””][/bt_hr][bt_button text=”Project image gallery” icon=”fa_f1c5″ url=”https://www.cell-crete.com/bay-37-alameda-point-gallery/” target=”_blank” style=”accent” size=”small” width=”full” el_class=”” el_style=””][/bt_button][/bt_column][/bt_row][/bt_section]