Bay 37 – Alameda Point

https://www.cell-crete.com/build/wp-content/uploads/2020/12/Bay_37_Cell-Crete5-scaled-e1612815895809.jpeg

Project: Bay 37 – Alameda Point

Title:

Description:

Bay 37 – Alameda Point

Bay_37_Cell-Crete5-1200x869.jpeg

About The Project

PROJECT LOCATION

Alameda, California

COMPLETION DATE

2021

Bay 37 – Alameda Point

New buildings are being constructed along with a variety of amenities for residents including picnic areas, a playground, a public dock, walking paths and more in Alameda, CA. Evaluation results of the proposed buildings concluded that the estimated total and differential settlements were excessive for the planned structures and settlement mitigation techniques be sought out.

The Solution

Lightweight cellular concrete was a proposed solution to reduce the long-term consolidation settlement of the site. The lightweight fill was placed underneath multiple building pads and streets to provide load balance for the soil. Before pouring the soil was excavated, then 8’ of LCC was poured in 3 lifts. Utilities were installed prior to the pour and in between the placement of each cellular concrete lift.

Project Assets


CORPORATE OFFICE

Los Angeles:
135 E. Railroad Avenue
Monrovia, CA 91016



Cell-Crete: The Leading Cellular Concrete Provider of Choice in North America

CAREERS

Your subscription could not be saved. Please try again.
Your subscription has been successful.

NEWSLETTER

Subscribe and stay updated on our latest news!